Framework for realistic and meaningful proof-of-concept evaluation of the StratiSYSTEM platform.

INTRODUCTION

This guide provides step-by-step guidance for successfully deploying and validating a StratiSYSTEM proof-of-concept (PoC) environment. Whether evaluating performance, scalability, application compatibility, availability, or operational simplicity, this guide is designed to help organizations achieve a successful PoC with minimal complexity and maximum impact.

By following the recommended practices outlined in this guide, organizations can effectively demonstrate the value, flexibility, and capabilities of the StratiSYSTEM platform within a real-world operating environment.

POC REQUIREMENTS

As with production deployments, a PoC may involve a variety of hardware, networking, and storage configurations. The following requirements establish the minimum recommended baseline for a successful and functional PoC environment.

Server Infrastructure

A minimum of one (1) Intel or AMD x86-based server node is required, with three (3) nodes preferred. StratiSYSTEM supports industry-standard x86 server platforms regardless of vendor, make, or model, subject to hardware compatibility.

Component Minimum Configuration Recommended Configuration
Server Nodes 1 node 3 nodes
Processor 1 x 16-core processor, 2.0 GHz or higher 2 x 16-core processors, 2.0 GHz or higher
System Memory 64 GB RAM 128 GB RAM or greater
Operating System Disk 1 x 200 GB disk or larger 200 GB or larger
Data Disks 2 x HDD, SSD, or NVMe devices of any capacity Configuration appropriate for the intended workloads
Network Interfaces 1 x 10GbE port 2 x 10GbE ports or faster for public and private network segmentation

Network Infrastructure and Services

The following network infrastructure and supporting services must be available and properly configured prior to beginning the PoC deployment:

IMPORTANT

Do not manually modify the network configuration of a StratiSYSTEM host. All host-level network configuration changes must be performed using the integrated StratiSYSTEM management services by SteelDome personnel as part of the deployment preparation process.

Storage Infrastructure

For PoC environments that include StratiSTOR or HyperSERV, the following additional storage requirements apply:

IMPORTANT

All servers, storage devices, network infrastructure, management interfaces, and supporting services must be properly configured, validated, and fully operational prior to the start of the PoC.

POC SUCCESS CRITERIA

A clear understanding of the objectives and measurable success criteria must be established and agreed upon by all participating stakeholders before deploying the PoC environment.

At a minimum, the PoC should provide operational validation across the following areas:

POC Execution Phases

Members of the SteelDome engineering team will collaborate with the client engineering team throughout all phases of the PoC. A typical engagement follows the structured execution phases outlined below.

Phase Activity Objective
01 Planning and Review Establish requirements, deployment architecture, evaluation objectives, and measurable success criteria.
02 Baseline Deployment Install and configure the StratiSYSTEM environment and validate baseline infrastructure operations.
03 Feature Enablement Configure and enable platform capabilities relevant to the evaluation objectives.
04 Feature Testing Validate the functionality and operational behavior of selected platform capabilities.
05 Performance Testing Measure infrastructure and workload performance against established requirements.
06 Interoperability Testing Validate compatibility with existing infrastructure, applications, workloads, and supporting services.
07 Failure Injection Testing Evaluate availability, fault tolerance, recovery behavior, and operational resiliency within controlled failure scenarios.
08 Success Determination Review evaluation results against agreed-upon success criteria and determine the appropriate next steps.

POC Timeline and Engineering Checkpoints

PoC timelines may vary depending on deployment complexity, infrastructure readiness, workload requirements, and the scope of the evaluation. However, the target completion window is generally within 30 to 45 days following the initial deployment.

Regular engineering checkpoints between SteelDome and the client are encouraged throughout the evaluation to:

RECOMMENDED PRACTICE

Establish a recurring engineering checkpoint at the beginning of the PoC and maintain a shared record of evaluation objectives, test results, outstanding issues, and completion status throughout the engagement.

Upon completion of the evaluation, SteelDome and the client engineering team will jointly review the results, determine whether the established success criteria have been achieved, and identify the appropriate next steps toward production deployment.